Free 15-minute call
Free
Talk it through with an engineer, and leave with what we would build first and roughly what it costs.
Book a free callGive every job one record that moves on as the work does, not when someone remembers to update a spreadsheet. A scan at each step, live boards on the wall and alerts on anything that sticks mean nobody has to walk the floor or ring round to find out what is due.
Why it happens
What to do about it
List the steps every job goes through, from order to dispatch, in the order they happen.
One record that every team works from, instead of copies in different places.
A scan or a tap at each stage updates the record, so the status comes from doing the work.
Show the day’s work where the team can see it, sorted by what is due first.
Give each stage a time limit, and raise an alert when a job sits too long.
How we built against it
Built for the print and production company we run ourselves
Every job sheet carries a scan code, and the status of every job is on the wall for everyone to see.
The result
Less chasing, fewer missed dispatches and a calmer floor.
For your business
We map your stages, give every job a code and a live status, and put it on the screens and phones your team already has.
For example, a kitchen maker could scan each order as it is cut, assembled and loaded, with a board in the workshop showing what goes out today and an alert when a job stalls.
Want this for your business?What it costs
Free
Talk it through with an engineer, and leave with what we would build first and roughly what it costs.
Book a free callFrom £4,500
two weeks
Your stages and hand-offs mapped, and the first live board shipped inside the two weeks.
Start with thisFrom £12,000
per project
Job records, scan codes, live boards and dispatch, built around how your floor works.
Start with thisPrices exclude VAT where it applies. A “from” price is the starting point for the simplest version. We confirm the price in writing before any work starts.
How it starts
Questions
Read next
Tell us how it works for you today. In fifteen minutes we will tell you what we would build first, and what it would cost.